Tap an option to check your answer — the correct answer and full explanation appear after you choose.
MathematicsTime & WorkPPSCID: PPP-568
A and B together can complete a work in 10 days. A alone can complete the same work in 12 days. In how many days can B alone complete that work?
A50 days
B60 days ✓ Correct answer
C70 days
D80 days
✓ Correct answer: 60 days
Full explanation
B's daily work is 1/10 − 1/12 = 1/60, so B alone takes 60 days.
MathematicsTime & WorkPPSCID: PPP-572
A worker makes a basket in 2/3 of an hour. How many baskets does he make in 7.5 hours?
A45/3
B45/4 ✓ Correct answer
C45/5
D45/6
✓ Correct answer: 45/4
Full explanation
7.5 ÷ (2/3) = 7.5 × 3/2 = 45/4.
MathematicsTime & WorkPPSCID: PPP-644
8 men do a work in 9 days. How many days will 6 men take to complete the same work?
A8 days
B9 days
C12 days ✓ Correct answer
D14 days
✓ Correct answer: 12 days
Full explanation
Total work is 8 x 9 = 72 man-days, so 6 men need 72/6 = 12 days.
MathematicsTime & WorkFPSCID: FPP-113
Six clerks can complete a piece of work in 15 hours. After working for 5 hours, 3 more clerks join them with the same efficiency. How much total time will be required to complete the work?
A11 hours 40 minutes ✓ Correct answer
B11 hours 50 minutes
C11 hours 20 minutes
DNone of these
✓ Correct answer: 11 hours 40 minutes
Full explanation
11 hours 40 minutes. The work totals 6 × 15 = 90 clerk-hours. In 5 hours, 6 clerks do 30 clerk-hours, leaving 60; 9 clerks take 60 ÷ 9 = 6 hours 40 minutes, so the total time is 5 hours + 6 hours 40 minutes = 11 hours 40 minutes.
MathematicsTime & WorkFPSCID: FPP-155
5 workers complete a job in 12 days. How long will 6 workers take at the same rate?
A8 days
B10 days ✓ Correct answer
C11 days
DNone of these
✓ Correct answer: 10 days
Full explanation
10 days. The work is 5 × 12 = 60 worker-days, so 6 workers take 60 ÷ 6 = 10 days. The other periods do not match the total work.
MathematicsTime & WorkFPSCID: FPP-373
If A completes a work in 12 days and B completes it in 18 days, how many days will they take together?
A7.2 days ✓ Correct answer
B8 days
C9 days
DNone of these
✓ Correct answer: 7.2 days
Full explanation
7.2 days. Together they do 1/12 + 1/18 = 5/36 of the work per day, so the job takes 36/5 = 7.2 days; 8 and 9 days are too long.
MathematicsTime & WorkBPSCID: BPP-458
If 4 workers finish a task in 6 days, 3 workers will finish in?
A10
B8 ✓ Correct answer
C7
DNone of these
✓ Correct answer: 8
Full explanation
4 workers finish in 6 days 1 worker will finish in 4 × 6 = 24 days 3 workers will finish in 24/3 = 8 days.
MathematicsTime & WorkNTSID: NPP-571
If it takes a machine 1/3 of a minute to produce one item, how many items will it produce in 10 minutes?
A70
B60
C30 ✓ Correct answer
D50
✓ Correct answer: 30
Full explanation
30. The machine makes 3 items per minute (1 ÷ 1/3), so in 10 minutes it makes 3 × 10 = 30 items.
MathematicsTime & WorkGBTSID: LTP-335
A man can complete a work in 10 days. How much work will he do in 4 days?
A1/5
B2/5 ✓ Correct answer
C3/5
D4/5
✓ Correct answer: 2/5
Full explanation
2/5. In 4 days out of 10, the man completes 4 ÷ 10 = 2/5 of the work.
MathematicsTime & WorkSTSID: LTP-547
4 workers take 9 hours to dig a well, working at the same rate, if they work together for 4 hours. How many hours take 6 workers to dig the same well?
A6 ✓ Correct answer
B7
C8
DNone of these
✓ Correct answer: 6
Full explanation
6. 4 workers take 9 hours => Total work = 4 × 9 = 36 worker-hours 6 workers => time = Total work / workers = 36 / 6 = 6 hours
MathematicsTime & WorkSTSID: LTP-551
A wall with an area of 14m² can be painted in 35 minutes. The time taken to paint 26m² wall will be _____?
A65 minutes ✓ Correct answer
B70 minutes
C75 minutes
DNone of these
✓ Correct answer: 65 minutes
Full explanation
65 minutes. 14m² → 35 minutes 26m² → x minutes x = (26 × 35) / 14 x = 65 minutes
MathematicsTime & WorkOTSID: LTP-826
If A and B together can complete a work in 18 days, A and C together in 12 days and B and C together in 9 days, then B alone can do the work in ____?
A40 days
B30 days
C24 days ✓ Correct answer
D18 days
✓ Correct answer: 24 days
Full explanation
24 days. Adding the three rates: 1/18 + 1/12 + 1/9 = 1/4, so together A, B and C do 1/8 of the work per day; B's rate is 1/8 - 1/12 = 1/24, so B alone takes 24 days.
MathematicsTime & WorkOTSID: LTP-873
If a tractor can plow 2 acr of land in 4 hours, how many acres can it plow in 8 hours?
A4 acrs ✓ Correct answer
B6 acrs
C8 acrs
D10 acrs
✓ Correct answer: 4 acrs
Full explanation
4 acrs. At 2 acres in 4 hours the tractor plows half an acre per hour, so in 8 hours it plows 4 acres.
MathematicsTime & WorkSTSID: LTP-1621
I have to work for 500 minutes a day at any workplace. If I reach at 9:15 am today, then I should leave at?