Under the Indus Waters Treaty, which rivers did Pakistan get control over?

  1. ARavi, Beas and Sutlej
  2. BIndus, Ravi and Beas
  3. CIndus, Jhelum and Chenab ✓ Correct answer
  4. DJhelum, Ravi and Sutlej
Pakistan StudiesEnergy & Water Issues CSS PPSC FPSC NTSID: PA-190

What is the main purpose of a dam?

  1. ATo store water for irrigation and to produce electricity ✓ Correct answer
  2. BTo make rain fall
  3. CTo stop earthquakes
  4. DTo carry ships across a river
Pakistan StudiesEnergy & Water Issues CSSID: CPP-320

India has constructed Baglihar Dam on ______________ River.

  1. ARavi
  2. BIndus
  3. CJhelum
  4. DNone of these ✓ Correct answer
Pakistan StudiesEnergy & Water Issues CSSID: CPP-690

The Pakistan–Qatar long-term LNG agreement was signed on:

  1. A20 May, 2019
  2. B10 February, 2016 ✓ Correct answer
  3. C15 January, 2019
  4. D5 May, 2017
Pakistan StudiesEnergy & Water Issues ANFID: FPP-16121

What is the installed generation capacity of the Tarbela Dam?

  1. A3,478 MW.
  2. B2,450 MW.
  3. C5,200 MW.
  4. D4,888 MW. ✓ Correct answer
Pakistan StudiesEnergy & Water Issues ANFID: FPP-12468

Which dam is the largest hydroelectric project in Pakistan?

  1. AGhazi Barotha
  2. BWarsak Dam
  3. CTarbela Dam ✓ Correct answer
  4. DMangla Dam
Pakistan StudiesEnergy & Water Issues ANFID: FPP-12526

Which is the largest source of electricity in Pakistan?

  1. AHydropower ✓ Correct answer
  2. BSolar power
  3. CThermal power
  4. DNuclear power