Surveying MCQs

8 practice MCQs on this page Page 3 of 3

Tap an option to check your answer — the correct answer and full explanation appear after you choose.

Civil EngineeringSurveying PTSID: FPP-16318

The construction of the optical square is based on the principle of optical:

  1. AReflection
  2. BRefraction
  3. CDouble refraction
  4. DDouble reflection ✓ Correct answer
Civil EngineeringSurveying PTSID: FPP-16333

The sag correction applied to a tape measurement is always:

  1. APositive
  2. BNegative ✓ Correct answer
  3. CZero
  4. DPositive for short spans only
Civil EngineeringSurveying PTSID: FPP-16338

A line joining points of equal elevation on a map is called a:

  1. AContour ✓ Correct answer
  2. BGradient
  3. CMeridian
  4. DBaseline
Civil EngineeringSurveying PTSID: FPP-16339

In levelling, a backsight is taken on a point of:

  1. AKnown elevation ✓ Correct answer
  2. BUnknown elevation
  3. CZero elevation
  4. DNegative elevation
Civil EngineeringSurveying PTSID: FPP-16340

Check lines (or proof lines) in chain surveying are essentially required:

  1. ATo plot the chain lines
  2. BTo plot the offsets
  3. CTo indicate the accuracy of the survey work ✓ Correct answer
  4. DTo increase the out-turn
Civil EngineeringSurveying PTSID: FPP-16341

The magnetic bearing of a line differs from its true bearing by the:

  1. AMagnetic declination ✓ Correct answer
  2. BDip of the needle
  3. CLocal attraction
  4. DGrid convergence
Civil EngineeringSurveying PTSID: FPP-16342

A dumpy level is used mainly for:

  1. ADetermining differences in elevation ✓ Correct answer
  2. BSetting out right angles
  3. CMeasuring magnetic bearings
  4. DMeasuring horizontal distances
Civil EngineeringSurveying PTSID: FPP-16360

The whole circle bearing of a line in the south-east quadrant lies between:

  1. A0 degrees and 90 degrees
  2. B90 degrees and 180 degrees ✓ Correct answer
  3. C180 degrees and 270 degrees
  4. D270 degrees and 360 degrees

Practice these MCQs interactively