Structural Engineering MCQs

20 practice MCQs on this page Page 7 of 18

Tap an option to check your answer — the correct answer and full explanation appear after you choose.

Civil EngineeringStructural Engineering BPSCID: BPP-3974

What is the usual minimum curing period for concrete?

  1. A3 days
  2. B7 days ✓ Correct answer
  3. C14 days
  4. D28 days
Civil EngineeringStructural Engineering BPSCID: BPP-1281

Low heat cement is made by reducing the amount of tricalcium aluminate by ____%.

  1. A6
  2. B5 ✓ Correct answer
  3. CNone of these
  4. D4
Civil EngineeringStructural Engineering BPSCID: BPP-1282

______ is used for heat and insulation in refrigerator and air conditioning buildings.

  1. ANone of these
  2. BThermocole ✓ Correct answer
  3. CLinoleum
  4. DPlaster of Paris
Civil EngineeringStructural Engineering BPSCID: BPP-1283

If the sanctioned estimate increase by ___% a revised estimate is prepared.

  1. A5 ✓ Correct answer
  2. B4
  3. C2
  4. DNone of these
Civil EngineeringStructural Engineering BPSCID: BPP-1285

Parge is mainly a ______ coat applied on concrete surface.

  1. AProtective ✓ Correct answer
  2. BNone of these
  3. CGrouting
  4. DColor
Civil EngineeringStructural Engineering BPSCID: BPP-1286

In which cement the percentage of tricalcium silicate is low?

  1. ARapid hardening cement
  2. BSulphate resistant cement
  3. CAll of the above
  4. DLow heat cement ✓ Correct answer
Civil EngineeringStructural Engineering BPSCID: BPP-1288

In CPM analysis the event which has no float, is called _____?

  1. ANone of these
  2. BActivity
  3. CEvent
  4. DCritical event ✓ Correct answer
Civil EngineeringStructural Engineering BPSCID: BPP-1290

If a body is subjected to more unknown reactions than available number of equations of equilibrium, then the problem is ______?

  1. AStatically indeterminate ✓ Correct answer
  2. BStatically determinate
  3. CUnstable
  4. DBoth A and B
Civil EngineeringStructural Engineering BPSCID: BPP-1291

Factor of safety may be defined as the ratio of ultimate stress to ______?

  1. AWorking strain
  2. BWorking stress ✓ Correct answer
  3. CNone of these
  4. DElastic Modulus
Civil EngineeringStructural Engineering BPSCID: BPP-1292

Oxidation cause ______ on the surface of iron.

  1. ARusting ✓ Correct answer
  2. BStatic energy
  3. CNone of these
  4. DEfflorescence
Civil EngineeringStructural Engineering BPSCID: BPP-1293

The minimum area of reinforcement in a beam shall be greater than ______?

  1. A0.57 fv/bd
  2. BNone of these
  3. C0.57 bd/fv
  4. D0.85×b×d/fy ✓ Correct answer
Civil EngineeringStructural Engineering BPSCID: BPP-1294

The document containing the cost description engineering estimate and drawings of a project is called ______?

  1. ABidding Document
  2. BNone of these
  3. CPC II
  4. DPC I ✓ Correct answer
Civil EngineeringStructural Engineering BPSCID: BPP-1295

Which concrete mix will have greater strength?

  1. A1:4:8
  2. BNone of these
  3. C1:1:2 ✓ Correct answer
  4. D1:2:4
Civil EngineeringStructural Engineering BPSCID: BPP-1299

In an ideal condition the verandah should be placed in ______ direction.

  1. AS and W
  2. BNW and N ✓ Correct answer
  3. CSW and S
  4. DNone of these
Civil EngineeringStructural Engineering BPSCID: BPP-1300

A bar chart is also known as _____?

  1. AAll of the above
  2. BGantt chart ✓ Correct answer
  3. CMark chart
  4. DGalio chart
Civil EngineeringStructural Engineering BPSCID: BPP-1301

The area of a parabola is given by ______?

  1. Abh/3 ✓ Correct answer
  2. BBh
  3. CNone of these
  4. Dbh/2
Civil EngineeringStructural Engineering BPSCID: BPP-1308

The maximum percentage of steel used in columns is ______?

  1. A5%
  2. B6%
  3. CNone of these
  4. D4% ✓ Correct answer
Civil EngineeringStructural Engineering BPSCID: BPP-1309

The Agency hired to execute the work if the original contractor fails to execute the work ______?

  1. AConsultant
  2. BPetty contractor
  3. C3rd party ✓ Correct answer
  4. DNone of these
Civil EngineeringStructural Engineering BPSCID: BPP-1310

Rate and quantity of a project are provided in _____?

  1. ANone of these
  2. BProject drawings
  3. CBill of quantity (BOQ) ✓ Correct answer
  4. DPlans
Civil EngineeringStructural Engineering BPSCID: BPP-1311

The concrete after casting _____?

  1. ADoes not change
  2. BShrinks ✓ Correct answer
  3. CExpands
  4. DNone of these