What is the usual minimum curing period for concrete?
A 3 days
B 7 days ✓ Correct answer
C 14 days
D 28 days
✓ Correct answer: 7 days
Full explanation 7 days. Concrete is normally cured for at least 7 days so that it gains sufficient strength and does not dry out too quickly.
Civil Engineering Structural Engineering BPSC ID: BPP-1281
Low heat cement is made by reducing the amount of tricalcium aluminate by ____%.
A 6
B 5 ✓ Correct answer
C None of these
D 4
✓ Correct answer: 5
Full explanation 5. In low heat cement the tricalcium aluminate (C3A) content is kept to about 5%.
Civil Engineering Structural Engineering BPSC ID: BPP-1282
______ is used for heat and insulation in refrigerator and air conditioning buildings.
A None of these
B Thermocole ✓ Correct answer
C Linoleum
D Plaster of Paris
✓ Correct answer: Thermocole
Full explanation Thermocole. Thermocole is used for heat insulation in refrigerators and air-conditioned buildings.
Civil Engineering Structural Engineering BPSC ID: BPP-1283
If the sanctioned estimate increase by ___% a revised estimate is prepared.
A 5 ✓ Correct answer
B 4
C 2
D None of these
✓ Correct answer: 5
Full explanation 5. If the sanctioned estimate increases by 5%, a revised estimate is prepared.
Civil Engineering Structural Engineering BPSC ID: BPP-1285
Parge is mainly a ______ coat applied on concrete surface.
A Protective ✓ Correct answer
B None of these
C Grouting
D Color
✓ Correct answer: Protective
Full explanation Protective. Parge is mainly a protective coat applied on a concrete surface.
Civil Engineering Structural Engineering BPSC ID: BPP-1286
In which cement the percentage of tricalcium silicate is low?
A Rapid hardening cement
B Sulphate resistant cement
C All of the above
D Low heat cement ✓ Correct answer
✓ Correct answer: Low heat cement
Full explanation Low heat cement. Low heat cement is made with a low content of tricalcium silicate (C3S) and tricalcium aluminate (C3A). The site's key 'Sulphate resistant cement' is wrong and was overruled.
Civil Engineering Structural Engineering BPSC ID: BPP-1288
In CPM analysis the event which has no float, is called _____?
A None of these
B Activity
C Event
D Critical event ✓ Correct answer
✓ Correct answer: Critical event
Full explanation Critical event. In CPM analysis the event with no float is called a critical event.
Civil Engineering Structural Engineering BPSC ID: BPP-1290
If a body is subjected to more unknown reactions than available number of equations of equilibrium, then the problem is ______?
A Statically indeterminate ✓ Correct answer
B Statically determinate
C Unstable
D Both A and B
✓ Correct answer: Statically indeterminate
Full explanation Statically indeterminate. A body with more unknown reactions than equilibrium equations is statically indeterminate.
Civil Engineering Structural Engineering BPSC ID: BPP-1291
Factor of safety may be defined as the ratio of ultimate stress to ______?
A Working strain
B Working stress ✓ Correct answer
C None of these
D Elastic Modulus
✓ Correct answer: Working stress
Full explanation Working stress. The factor of safety is the ratio of ultimate stress to working stress.
Civil Engineering Structural Engineering BPSC ID: BPP-1292
Oxidation cause ______ on the surface of iron.
A Rusting ✓ Correct answer
B Static energy
C None of these
D Efflorescence
✓ Correct answer: Rusting
Full explanation Rusting. Oxidation causes rusting on the surface of iron.
Civil Engineering Structural Engineering BPSC ID: BPP-1293
The minimum area of reinforcement in a beam shall be greater than ______?
A 0.57 fv/bd
B None of these
C 0.57 bd/fv
D 0.85×b×d/fy ✓ Correct answer
✓ Correct answer: 0.85×b×d/fy
Full explanation 0.85×b×d/fy. Under IS 456 the minimum area of reinforcement in a beam must be greater than 0.85×b×d/fy.
Civil Engineering Structural Engineering BPSC ID: BPP-1294
The document containing the cost description engineering estimate and drawings of a project is called ______?
A Bidding Document
B None of these
C PC II
D PC I ✓ Correct answer
✓ Correct answer: PC I
Full explanation PC I. The PC-I is the detailed project document containing the cost description, engineering estimate and drawings of a project, while PC-II covers feasibility studies and surveys. The site's key 'PC II' is wrong and was overruled.
Civil Engineering Structural Engineering BPSC ID: BPP-1295
Which concrete mix will have greater strength?
A 1:4:8
B None of these
C 1:1:2 ✓ Correct answer
D 1:2:4
✓ Correct answer: 1:1:2
Full explanation 1:1:2. Of the mixes listed, 1:1:2 is the richest and has the greatest strength.
Civil Engineering Structural Engineering BPSC ID: BPP-1299
In an ideal condition the verandah should be placed in ______ direction.
A S and W
B NW and N ✓ Correct answer
C SW and S
D None of these
✓ Correct answer: NW and N
Full explanation NW and N. In ideal conditions the verandah is placed in the north-west and north direction.
Civil Engineering Structural Engineering BPSC ID: BPP-1300
A bar chart is also known as _____?
A All of the above
B Gantt chart ✓ Correct answer
C Mark chart
D Galio chart
✓ Correct answer: Gantt chart
Full explanation Gantt chart. A bar chart is also known as a Gantt chart.
Civil Engineering Structural Engineering BPSC ID: BPP-1301
The area of a parabola is given by ______?
A bh/3 ✓ Correct answer
B Bh
C None of these
D bh/2
✓ Correct answer: bh/3
Full explanation bh/3. The area of a parabola (parabolic spandrel) is given by bh/3.
Civil Engineering Structural Engineering BPSC ID: BPP-1308
The maximum percentage of steel used in columns is ______?
A 5%
B 6%
C None of these
D 4% ✓ Correct answer
✓ Correct answer: 4%
Full explanation 4%. The maximum percentage of steel in a column is generally restricted to 4% under IS 456 to avoid congestion, with 6% as the absolute cap.
Civil Engineering Structural Engineering BPSC ID: BPP-1309
The Agency hired to execute the work if the original contractor fails to execute the work ______?
A Consultant
B Petty contractor
C 3rd party ✓ Correct answer
D None of these
✓ Correct answer: 3rd party
Full explanation 3rd party. If the original contractor fails to execute the work, a 3rd party agency is hired to execute it.
Civil Engineering Structural Engineering BPSC ID: BPP-1310
Rate and quantity of a project are provided in _____?
A None of these
B Project drawings
C Bill of quantity (BOQ) ✓ Correct answer
D Plans
✓ Correct answer: Bill of quantity (BOQ)
Full explanation Bill of quantity (BOQ). The rate and quantity of a project are provided in the bill of quantity (BOQ).
Civil Engineering Structural Engineering BPSC ID: BPP-1311
The concrete after casting _____?
A Does not change
B Shrinks ✓ Correct answer
C Expands
D None of these
✓ Correct answer: Shrinks
Full explanation Shrinks. Concrete shrinks after casting as it dries.
Practice these MCQs interactively
← Civil Engineering MCQs