Time & Work — Study Notes
What to learn in Time & Work
This topic is time and work the way the one-paper exams ask it: a job, a worker, and a clock. There are 138 practice questions on this page: 118 from the bank and 20 new ones written to fill the gaps the bank leaves — most of them where the bank has the method but never asks it at all: wages shared by the work done, a worker twice or three times as efficient as another, work on alternate days, a worker who leaves or joins midway, three workers given only in pairs, men and women working at different rates, the full MDH formula with hours and units, a pipe that closes midway, a leak that slows the filling, and a tank filled by litres per minute. The order below is the order to learn in. Start with work and rate, because every later section is that one idea with more workers or a tank instead of a job. Then combined work, then men-days, then efficiency, then wages, then pipes and cisterns, and last the workers who leave, join or take turns. Past papers — PPSC, FPSC, SPSC, BPSC, NTS, ETEA, OTS, STS and CSS — ask the same few computations again and again: two workers together, how many men for how many days, one worker's share of the pay, and two pipes on one tank. Learn the rate once, and then practise it until the right option feels obvious. Four boundary rules for this page. First, speed facts live on the Speed Time & Distance page: a motorcycle's kilometres per litre, a boat's downstream speed and a race beaten by so many metres are speed problems, not work problems, and they are not taught here. Second, average speed and the average of a group live on the Averages page; this page uses averages only where a work problem needs one. Third, ratios and proportions live on the Ratios & Proportions page; this page uses a ratio only inside a work problem, such as the ratio of two rates or two shares of pay. Fourth, the general chain-rule method has its own page in the inventory; this page teaches the men-days form of it, which is the form the work questions use.
Work and rate: the one-day work
Every question in this topic is one relation: work = rate x time. The whole job is 1 unit of work. If A finishes a job in n days, then A does 1/n of the job in one day — that is A's one-day work, which is also A's rate. If A does 1/n of the job in one day, then A finishes the whole job in n days. The part done in d days is d/n of the job, and the time needed to do a fraction f of the job is f x n days: a man who does 3/4 of a job in 9 days needs 3 more days, because the whole job takes 9 divided by 3/4, which is 12 days. A machine that makes one item in 1/3 of a minute makes 3 items a minute, so in 10 minutes it makes 30 items. When the fractions get awkward, use the LCM method: call the whole job the lowest common multiple of the given times. If A takes 10 days and B takes 15 days, call the job 30 units; A does 3 units a day and B does 2, so together they do 5 units a day and finish in 6 days. The LCM method turns every fraction into a whole number, which is why it is the fastest way to work in the exam. One habit to build now: always convert the given times into rates before doing anything else. A question that gives days is really giving rates in disguise, and the rates are the numbers that add, subtract and divide.
The three formulas that run the whole topic
- Work = rate x time.
- If A finishes a job in n days, A's one-day work is 1/n of the job.
- Part done in d days is d/n of the job; time for a fraction f of the job is f x n days.
The LCM method, for clean arithmetic
- Call the whole job the LCM of the given times.
- A in 10 days and B in 15 days: job = 30 units, A does 3 a day, B does 2 a day.
- Together they do 5 units a day, so the job takes 30 / 5 = 6 days.
Work-rate in other clothes
- A wall painted: 14 square metres in 35 minutes, so 26 square metres take 65 minutes.
- A basket made in 2/3 of an hour: in 7.5 hours the worker makes 45/4 baskets.
- A tractor ploughing 2 acres in 4 hours ploughs 4 acres in 8 hours.
Combined work: adding rates, never days
When two or more workers work together, their rates add. If A does 1/x of the job in a day and B does 1/y, together they do 1/x + 1/y in a day, so the job takes 1 divided by (1/x + 1/y) days, which is xy/(x+y) days. A in 10 days and B in 15 days take 10 x 15 / (10 + 15) = 6 days together; A in 20 days and B in 30 days take 12 days; A in 6 days, B in 12 and C in 12 take 3 days, because 1/6 + 1/12 + 1/12 = 1/3. The trap is adding the days: A in 10 days and B in 15 days do not take 25 days together, and they do not take 12.5 days either — together they are faster than either one alone, so the answer must be shorter than the shorter time, 10 days. To find one worker alone from the pair, subtract the rates: A and B together take 6 days and A alone takes 10, so B does 1/6 - 1/10 = 1/15 of the job a day and takes 15 days alone. A and B together take 10 days and A alone takes 12, so B does 1/10 - 1/12 = 1/60 a day and takes 60 days alone — a slow partner can hide behind a fast one, and the subtraction shows it. When three workers are given only in pairs, add all three pair-rates and halve: A and B in 18 days, A and C in 12 and B and C in 9 gives a combined rate of (1/18 + 1/12 + 1/9) / 2 = 1/8 a day, so B's rate is 1/8 - 1/12 = 1/24 and B alone takes 24 days. The same halving trick answers any pair question, and it is the only new idea in the whole section: everything else is adding and subtracting rates.
The combined-work formulas
- Two workers: time together = xy / (x + y) days.
- Three or more workers: add all the one-day rates, then take the reciprocal.
- One worker alone: B's rate = combined rate - A's rate, then take the reciprocal.
The checks that catch a wrong answer
- Together is always faster than the faster worker alone.
- Together is always slower than half the slower worker's time is impossible — check: two equal workers take half the time.
- If the answer is longer than either worker alone, the rates were added the wrong way.
Men-days and the MDH formula
When the workers are all the same, the work is men x days. Ten workers finishing a job in 6 days is 60 man-days of work, so 12 workers take 60 / 12 = 5 days, and 5 workers take 60 / 5 = 12 days. More workers means fewer days and fewer workers means more days: the two are inversely proportional, so doubling the workers halves the time. When hours per day and the amount of work also change, use the full formula: M1 x D1 x H1 / W1 = M2 x D2 x H2 / W2, where M is men, D is days, H is hours per day and W is the work done. Thirty workers making 3,000 units in 20 days at 8 hours a day is 4,800 worker-hours for 3,000 units, so 2,000 units need 3,200 worker-hours, and 32 workers at 10 hours a day finish in 10 days. Twenty-one binders binding 1,400 books in 15 days means 9 binders bind 800 books in 20 days. Eleven persons arranging 319 books in 4 hours means 20 persons arrange 725 books in 5 hours. The same formula handles the food and the herds: an army camp of 200 men with food for 60 days has 12,000 man-days of food, so 160 men eat for 75 days; a herd that eats its food in 150 days, and in 160 days when 10 cows fewer are there, had 160 cows to begin with. Men, women and children work at different rates, so convert them first: if 3 men do the work of 5 women, then 6 men are 10 women, and 6 men plus 5 women are 15 women, three times the 5-women team, so they take a third of the time. A mixed team is handled the same way: 16 men and 12 women finish a job in 20 days while 18 women alone take 40 days, so one woman does 1/720 of the job a day and one man does 1/480, and 12 men plus 27 women do 1/16 of the job a day, finishing in 16 days. Convert first, then add the rates.
The men-days formulas
- Same work, same hours: M1 x D1 = M2 x D2.
- With hours and amount of work: M1 x D1 x H1 / W1 = M2 x D2 x H2 / W2.
- One worker alone takes men x days; days for a new team is man-days divided by the new team.
The conversion step
- Men, women and children: convert everyone to the same worker before adding rates.
- 3 men = 5 women, so 6 men = 10 women.
- Food, herds and trees are man-days too: total food = men x days.
The 'how many more' trap
- 40 men finish 1/3 of a work in 40 days; the remaining 2/3 in 50 days needs 64 men, so 24 MORE men.
- 15 men hired for 10 days, job in 3 days: 50 men needed, so 35 MORE men.
- Always subtract the men already there — the question asks for the extra men.
Efficiency: faster means fewer days
Efficiency is the rate, and efficiency and time are inversely proportional for the same work: twice as efficient means half the time, three times as efficient means a third of the time. B is twice as efficient as A and A takes 10 days, so B takes 5 days. A is 3 times as efficient as B and B takes 12 days, so A takes 4 days. B is 50% more efficient than A, so B's rate is 1.5 times A's and B takes 12 / 1.5 = 8 days. The common mistake is the direction: a more efficient worker takes LESS time, not more, and the papers set that trap in every sitting. Efficiency also comes as a ratio: A is 1.75 times as efficient as B and together they take 7 days, so the total work is 7 x (1.75 + 1) = 19.25 units and A alone takes 19.25 / 1.75 = 11 days. When two workers of different efficiency work together, add their rates exactly as before — efficiency only changes what each rate is. A is twice as efficient as B and B alone takes 12 days, so A alone takes 6 days and together they do 1/6 + 1/12 = 1/4 of the work a day, finishing in 4 days. Learn the inversion once — faster means fewer days — and every efficiency question is a one-line division.
The efficiency rules
- Efficiency and time are inversely proportional for the same work.
- k times as efficient means 1/k of the time.
- 50% more efficient means the rate is 1.5 times, so the time is divided by 1.5.
Efficiency as a ratio
- A : B = 1.75 : 1 and together 7 days: total work = 7 x 2.75 = 19.25 units.
- A alone takes 19.25 / 1.75 = 11 days.
- Convert the ratio to rates first, then add the rates as usual.
Work and wages: paid by the work done
Wages are shared in the ratio of the work done, and the work done is in the ratio of the rates — never in the ratio of the days. A takes 15 days and B takes 10 days, so their rates are 1/15 and 1/10, the ratio of work done is 2 : 3, and Rs. 600 splits as Rs. 240 for A and Rs. 360 for B. A takes 12 days, B 18 and C 36, so the rates are 1/12 : 1/18 : 1/36 = 3 : 2 : 1, and Rs. 1,800 splits as Rs. 900, Rs. 600 and Rs. 300. The trap is sharing by the days: the worker who takes longer did LESS work per day, so the longer time means the SMALLER share. To find one worker's share from the pair, find that worker's rate first: A and B together take 12 days and are paid Rs. 900, while A alone takes 20 days, so B's rate is 1/12 - 1/20 = 1/30, the ratio of work is A : B = 1/20 : 1/30 = 3 : 2, and B's share is Rs. 360. Daily wages follow the same rule: a worker's daily wage is proportional to the worker's rate, so the fastest worker earns the most per day. The whole section is one sentence — pay follows the rate — and every wages question is a rates question with rupees on top.
The wages rule
- Wages are shared in the ratio of the work done.
- Work done is in the ratio of the rates, never the ratio of the days.
- Longer time alone means a smaller share, because the daily rate is lower.
The working, in order
- Turn each worker's days into a rate: 1 divided by the days.
- Write the rates as a ratio and clear the fractions.
- Split the total pay by that ratio.
Pipes and cisterns: the tank is the job
A pipes-and-cisterns question is a time-and-work question in which the job is filling or emptying a tank. A pipe that fills the tank in x hours fills 1/x of the tank in one hour, and a pipe that empties it in y hours empties 1/y in one hour. Two inlets add exactly like two workers: a pipe filling in 10 hours and a pipe filling in 15 hours together fill 1/10 + 1/15 = 1/6 of the tank an hour, so the tank fills in 6 hours. An outlet is negative work: a pipe filling in 5 hours and a pipe emptying in 10 hours together fill 1/5 - 1/10 = 1/10 an hour, so the tank fills in 10 hours — slower than the inlet alone, which is the check that the subtraction went the right way. A pipe filling in 5 hours with an outlet emptying in 6 hours fills only 1/5 - 1/6 = 1/30 an hour, so the tank takes 30 hours. If the outlet is faster than the inlet, the tank never fills: the net rate is negative, and a full tank would empty instead. Three pipes are the same addition with a minus sign: pipes filling in 6 and 4 hours with one emptying in 12 hours fill 1/6 + 1/4 - 1/12 = 1/3 an hour, so the tank fills in 3 hours. A leak is an outlet with another name: a pipe fills a cistern in 8 hours but a leak makes it take 10, so the leak empties 1/8 - 1/10 = 1/40 of the cistern an hour and empties the full cistern in 40 hours; a pipe filling in 12 hours with a leak emptying in 18 hours fills 1/12 - 1/18 = 1/36 an hour, so the tank takes 36 hours. When the question gives litres per minute instead of hours, work directly with the volumes: an inlet supplying 15 litres a minute and a drain removing 5 litres a minute fill a 600-litre tank in 600 / 10 = 60 minutes. A pipe that fills 1/5 of a tank in one hour fills the whole tank in 5 hours, and a tap that fills a tank in 10 hours fills 1/5 of it in 2 hours — the part and the whole are the same division as the part of a job in the first section.
The pipes formulas
- Two inlets: time together = xy / (x + y) hours.
- Inlet x hours, outlet y hours (y slower): time to fill = xy / (y - x) hours.
- Net rate = sum of inlet rates - sum of outlet rates; time = 1 / net rate.
The checks
- With a leak open, the fill time must be longer than with the inlet alone.
- If the outlet is faster than the inlet, an empty tank never fills.
- A leak is an outlet: subtract its rate, do not add it.
Litres instead of hours
- Net flow = inlet litres per minute - outlet litres per minute.
- Time = tank capacity / net flow.
- Convert hours to minutes before mixing the units.
Leaving, joining and alternate days
When the team changes midway, split the work into segments and add the work done in each. Six clerks finish a piece of work in 15 hours; after 5 hours 3 more clerks join, so 30 clerk-hours are done and 60 remain, and 9 clerks take 60 / 9 = 6 hours 40 minutes, making 11 hours 40 minutes in all. A works alone for 4 days of a 12-day job, doing 1/3 of it, and B finishes the remaining 2/3 in 8 days, so B's rate is 1/12 a day and B alone takes 12 days. A and B together take 12 days and A alone takes 20; if they work together for 4 days and then A leaves, 1/3 is done, 2/3 is left, and B, whose rate is 1/30 a day, needs 20 more days. When a worker joins late, count what the first worker did alone and then use the combined rate for the rest: A takes 20 days and B takes 30; A works alone for 5 days, doing 1/4, and the remaining 3/4 at the combined rate of 1/12 a day takes 9 more days, so the work finishes 14 days from the start. When workers take turns, work in cycles: A in 10 days and B in 15 days on alternate days finish 1/10 + 1/15 = 1/6 of the work per two-day cycle, so six cycles finish the job in 12 days. Two pipes on alternate hours work the same way: a pipe filling in 6 hours and one filling in 8 hours fill 7/24 of the tank per two-hour cycle, so after three cycles 21/24 is filled and the remaining 1/8 takes the first pipe 45 minutes, making 6 hours 45 minutes in all. The warning for every cycle question is the last cycle: the job can finish in the middle of a cycle, on the first worker's turn, so never round the cycles up blindly — work out the last stretch separately.
The segment method
- Work done in a segment = rate x time in that segment.
- Add the segments; the total work is 1.
- A worker who leaves stops adding work; a worker who joins starts adding it.
The cycle method
- One full cycle = one turn for each worker.
- Work per cycle is the sum of the turns' rates.
- Finish the last cycle by hand — the job can end mid-cycle.
How to answer a time-and-work question in the exam
Read the question and name the job, the workers and the unit of time before touching a number — days, hours and minutes must never be mixed. Turn every given time into a rate at once: a worker who takes n days does 1/n of the job a day, a pipe that fills in n hours fills 1/n of the tank an hour. Decide whether the rates add or subtract: workers together add, a worker alone is found by subtracting, and an outlet or a leak subtracts. If the fractions look messy, switch to the LCM method and work in whole units. If the team changes, split the work into segments; if they take turns, work in cycles and finish the last one by hand. If the question asks for money, turn the rates into a ratio and split the pay by it; if it asks for men, turn the work into man-days. Then check the answer against common sense: together must be faster than the fastest worker alone, a leak must make the filling slower, more men must mean fewer days, and a more efficient worker must take less time. Any answer that breaks one of those is wrong even before the arithmetic is checked. The papers reuse the same numbers with new names — 10 and 15 days together is 6 days, 20 and 30 together is 12 — so a method learned once answers the next paper's version too.
The traps, one last time
- Adding the days instead of the rates.
- Sharing wages by the days instead of by the rates.
- Forgetting the men already there when the question asks how many MORE men.
- Rounding a cycle up instead of finishing the last stretch by hand.
- Mixing days and hours, or hours and minutes, in one sum.
The five checks
- Together is faster than the fastest worker alone.
- A leak makes the filling slower, never faster.
- More workers means fewer days; fewer workers means more days.
- A more efficient worker takes less time, not more.
- The shares of pay add up to the total pay.
More facts to learn
- <p><b>A can finish a job in10 days
- What part of the job can A finish in 1 day?</b><br>1/10 of the job.</p> <p><b>A man does 3/4 of a job in9 days
- How many more days will he need to finish the job?</b><br>3 days.</p> <p><b>If it takes a machine 1/3 of a minute to produce one item, how many items will it produce in 10 minutes?</b><br>30</p> <p><b>A man can complete a work in10 days
- How much work will he do in 4 days?</b><br>2/5</p> <p><b>A man can finish a work in12 days
- How much work does he do in 3 days?</b><br>1/4 part</p> <p><b>A man can finish a work in20 days
- How much work does he do in 2 days?</b><br>1/10 part</p> <p><b>A man can finish a work in10 days
- How much work does he do in 2 days?</b><br>1/5 part</p> <p><b>A man can finish a work in15 days
- How much work does he do in 5 days?</b><br>1/3 part</p> <p><b>A can do a job in12 days
- After working alone for 4 days, A leaves, and B finishes the remaining work in8 days
- How long would B take to do the whole job alone?</b><br>12 days</p> <p><b>A can do a job in 6 days and B can do it in12 days
- How many days will they take working together?</b><br>4 days</p> <p><b>A can do a job in 4 days and B can do it in12 days
- How many days will they take working together?</b><br>3 days</p> <p><b>A can do a job in 15 days and B can do it in30 days
- How many days will they take working together?</b><br>10 days</p> <p><b>A can do a job in 9 days and B can do it in18 days
- How many days will they take working together?</b><br>6 days</p> <p><b>A can do a job in 36 days and B can do it in12 days
- How many days will they take working together?</b><br>9 days</p> <p><b>A can do a job in 6 days and B can do it in3 days
- How many days will they take working together?</b><br>2 days</p> <p><b>A can do a job in 5 days and B can do it in10 days
- How many days will they take working together?</b><br>3 1/3 days</p> <p><b>A can do a job in 10 days and B can do it in10 days
- How many days will they take working together?</b><br>5 days.</p> <p><b>A can do a job in 30 days and B can do it in60 days
- How many days will they take working together?</b><br>20 days</p> <p><b>A can do a job in 12 days and B can do it in24 days
- How many days will they take working together?</b><br>8 days</p> <p><b>A can do a job in 40 days and B can do it in10 days
- How many days will they take working together?</b><br>8 days</p> <p><b>A can do a job in 6 days, B can do it in 12 days and C can do it in12 days
- How many days will they take working together?</b><br>3 days.</p> <p><b>A can do a job in 20 days and B can do it in5 days
- How many days will they take working together?</b><br>4 days</p> <p><b>A can do a job in 8 days and B can do it in8 days
- How many days will they take working together?</b><br>4 days</p> <p><b>A can do a job in 12 days and B can do it in12 days
- How many days will they take working together?</b><br>6 days</p> <p><b>A can do a job in 36 days and B can do it in18 days
- How many days will they take working together?</b><br>12 days.</p> <p><b>A and B together can do a job in6 days
- A alone can do it in10 days
- How many days will B take to do the job alone?</b><br>15 days.</p> <p><b>A finishes half a job in 5 days and then leaves
- B finishes the other half in10 days
- How many days would B need to do the whole job alone?</b><br>20 days.</p> <p><b>Three workers A, B and C can finish a job in 4, 6 and 12 days on their own
- If they work together, how many days will the job take?</b><br>2 days</p> <p><b>A and B together can do a job in4 days
- A alone can do it in6 days
- How many days will B take to do it alone?</b><br>12 days</p> <p><b>A can do a job in 30 days and B can do it in 45 days
- How many days will they take working together?</b><br>18 days</p> <p><b>A and B together can complete a work in10 days
- A alone can complete the same work in12 days
- In how many days can B alone complete that work?</b><br>60 days</p> <p><b>Six clerks can complete a piece of work in 15 hours
- After working for 5 hours, 3 more clerks join them with the same efficiency
- How much total time will be required to complete the work?</b><br>11 hours 40 minutes</p> <p><b>If A completes a work in 12 days and B completes it in 18 days, how many days will they take together?</b><br>7.2 days</p> <p><b>If A and B together can complete a work in 18 days, A and C together in 12 days and B and C together in 9 days, then B alone can do the work in ____?</b><br>24 days</p> <p><b>A and B can complete a work in 20 and 12 days respectively
- In how many days can A and B together complete that work?</b><br>30/4 days</p> <p><b>A can do a piece of work in 8 days and B can do it in24 days
- In how many days can they finish it together?</b><br>6</p> <p><b>A can do a piece of work in 20 days and B can do it in30 days
- In how many days can they finish it together?</b><br>12</p> <p><b>A can do a piece of work in 10 days and B can do it in15 days
- In how many days can they finish it together?</b><br>6</p> <p><b>A and B together can finish a work in12 days
- A alone can finish it in20 days
- In how many days can B alone finish it?</b><br>30 days</p> <p><b>A can do a piece of work in 10 days and B can do it in15 days
- If they work on alternate days, starting with A, in how many days will the work be finished?</b><br>12 days</p> <p><b>A and B together can do a piece of work in12 days
- A alone can do it in20 days
- If they work together for 4 days and then A leaves, in how many more days will B finish the remaining work alone?</b><br>20 days</p> <p><b>A alone can do a piece of work in12 days
- A works alone for 3 days, then B joins him, and they finish the work in 3 more days
- In how many days can B alone do the whole work?</b><br>6 days</p> <p><b>A can do a piece of work in 20 days and B can do it in30 days
- A starts the work alone and works for 5 days, then B joins him
- In how many days from the start will the work be finished?</b><br>14 days</p> <p><b>A and B together can do a piece of work in 6 days, B and C together in 8 days, and C and A together in12 days
- In how many days can A alone do the work?</b><br>16 days</p> <p><b>10 workers finish a job in6 days
- How many days will 12 workers take to do the same job?</b><br>5 days</p> <p><b>If 30 workers make 3000 units in 20 days, working 8 hrs a day, then 32 workers will produce 2000 units, working 10 hrs a day in how many days:</b><br>10 day</p> <p><b>If 5 men can complete a work in 6 days, then in how many days can 6 men complete the same work?</b><br>5</p> <p><b>A worker makes a basket in 2/3 of an hour
- How many baskets does he make in 7.5 hours?</b><br>45/4</p> <p><b>8 men do a work in9 days
- How many days will 6 men take to complete the same work?</b><br>12 days</p> <p><b>5 workers complete a job in12 days
- How long will 6 workers take at the same rate?</b><br>10 days</p> <p><b>If 4 workers finish a task in 6 days, 3 workers will finish in?</b><br>8</p> <p><b>A wall with an area of 14m² can be painted in 35 minutes
- The time taken to paint 26m² wall will be _____?</b><br>65 minutes</p> <p><b>If a tractor can plow 2 acr of land in 4 hours, how many acres can it plow in 8 hours?</b><br>4 acrs</p> <p><b>12 men can complete a job in20 days
- How many days will 5 men take to complete the same job?</b><br>48 days</p> <p><b>10 men can complete a job in14 days
- How long will it take 4 men to finish the same job if the same at the same rate?</b><br>35 days</p> <p><b>6 men can complete a job in10 days
- How many days will 15 men take to complete the same job?</b><br>4 days</p> <p><b>12 men can complete a job in15 days
- How many days will 20 men take to complete the same job?</b><br>9 days</p> <p><b>In a library, 11 persons arranged 319 books in4 hours
- How many persons are required to arrange 725 books in 5 hours?</b><br>20 persons</p> <p><b>If 14 men can paint a masjid in 12 hours, in how many hours can 8 men paint the same masjid?</b><br>21 hours</p> <p><b>It takes 8 men to take 18 chairs in9 days
- How many men can make 27 chairs in 6 days.</b><br>18 men</p>