Structural Engineering MCQs

Structural engineering the way the one-paper exams ask it — loads and stress, beams and slabs, columns, concrete and reinforced concrete, steel, foundations, dams, arches and bridges, and the building materials they are built from, with 265 practice questions from BPSC, FPSC, PPSC, NTS, OTS and PTS papers.

Facts checked 28 November 2026.265 practice MCQs on this topic

Structural Engineering — Study Notes

What to learn in Structural Engineering

This topic is structural engineering the way the one-paper exams ask it: BPSC Assistant Engineer and Sub Engineer (Civil), FPSC, PPSC, NTS, OTS and PTS papers, not theory for its own sake. There are 265 practice questions on this page: 224 from the bank and 41 new ones written to fill the gaps the bank leaves, most of them in foundations and in dams and bridges, which the bank covers thinly, and in columns and steel, which it covers with only a handful of questions each. The order below is the order to learn in. Start with structures and loads, because every later rule talks about stress, strain, bending moment and shear force. Then beams and slabs, then columns, then concrete and reinforced concrete, then steel, then foundations, then dams, arches and bridges, and last the building materials and masonry that a structure is actually built from. Learn the small table of numbers first: concrete is about ten times stronger in compression than in tension, M20 means 20 N/mm2 at 28 days, a rectangular column needs at least 4 bars and a circular one 6, column steel runs from 0.8% to 6%, and a simply supported beam with a central load has its biggest bending moment, WL/4, at the centre. Those few facts answer a surprising number of questions on this page. Two boundary rules for this page: soil mechanics has its own future topic, so this page takes foundations only as far as the footing types, the bearing capacity and the settlement that a structural designer must check; and estimation, contracts and project management (PC-I, bills of quantities, CPM and PERT) have their own future topics, so 41 bank questions on those subjects were moved out rather than wired here. What stays is the structure itself: how loads travel from the roof to the ground, and what each member must be to carry them.

Structures and loads: how a building stands up

A structure is a load path. The roof and floors carry the live load of people and furniture and their own dead weight, the beams carry that to the columns, the columns carry it to the footings, and the footings spread it into the ground. Every question in this branch is about one step of that path or one quantity that measures it. Stress is load divided by area, and its SI unit is N/m2; strain is change in length divided by original length, so a 300 cm rod that stretches 3 mm has a strain of 0.001. Hooke's law says that within the elastic limit stress is directly proportional to strain, and the constant is the modulus of elasticity: steel is about 200 GPa, and concrete is taken as 5000 times the square root of fck under IS 456. Poisson's ratio measures how a material bulges sideways when it is squeezed; steel is about 0.3, and rubber, at about 0.5, is the highest of the common materials. A body with more unknown reactions than equilibrium equations is statically indeterminate, and a structure with more members than stability needs is indeterminate too; the finite element method is the tool used when the shape is too complex or irregular for hand methods. The factor of safety is ultimate stress divided by working stress and is always greater than 1. Three words the papers keep apart: strength is the ability to resist failure by fracture and yielding, stiffness is the ability to resist deformation, and stability is the ability to keep the equilibrium shape under load. Creep is the slow extra strain under a sustained load, fatigue is failure under repeated loading, and a suddenly applied load produces twice the stress of the same load applied gradually. Two geometry facts to carry: the moment of inertia of a rectangle about its centroidal axis is bd3/12, and the centroid of a right-angled triangle sits b/3 along the base from the right angle.

The quantities, in one line each
  • Stress = load / area; unit N/m2 (pascal). Strain = change in length / original length; it has no unit.
  • Hooke's law: stress is proportional to strain within the elastic limit; E = stress / strain.
  • Factor of safety = ultimate stress / working stress; always greater than 1.
  • Slenderness ratio = effective length / least radius of gyration; it decides crushing against buckling.
  • A live load moves (people, furniture); a dead load is the fixed self-weight of the structure itself.
  • Lateral loads (wind, earthquake) are resisted by bracing and by shear walls, not by ordinary partition walls.
Traps the papers love
  • The moment of a force about a point is torque, not the first moment of area; if torque is not among the options, the answer is 'None of these'.
  • Strength, stiffness and stability are three different properties: strength resists breaking, stiffness resists bending, stability resists buckling and overturning.
  • A suddenly applied load doubles the stress; an impact load is worse still, so dynamic loads are never designed as if they were static.
  • The centre of gravity is where the whole weight can be taken to act, and the stability of a structure against overturning depends most on the shape and size of its foundation.

Beams and slabs: where the bending happens

The beam is the member the papers ask about most, because its bending moment and shear force diagrams are the whole of elementary structural analysis in miniature. Learn the four standard cases by heart. A simply supported beam with a central point load W has zero bending moment at the supports, maximum shear at the supports, and maximum bending moment WL/4 at the centre. The same beam under a uniform load w has maximum bending moment wL2/8 at midspan, and its bending moment diagram is a parabola. A cantilever with a point load P at the free end has zero bending moment at the free end and maximum bending moment PL at the fixed end, and the free-end deflection is PL3/3EI; under a uniform load the free-end deflection is wL4/8EI. The point of contraflexure is where the bending moment is zero and changes sign. Bending stress is zero at the neutral axis and greatest at the extreme top and bottom fibres, which is why a beam is made deeper rather than wider. Stirrups and bent-up bars are provided to resist shear, and the maximum shear force in a simply supported beam is at the supports. For reinforced concrete, IS 456 fixes the steel: minimum tension steel 0.85bd/fy, maximum 4% of the cross-section, and in a doubly reinforced beam steel sits in both the tension and the compression zones. A slab is one-way when the longer span is more than twice the shorter span, and two-way when the ratio is 2 or less; the maximum spacing of the main bars in a slab is 3 times the effective depth or 300 mm, whichever is less. A beam counts as a deep beam when its span-to-depth ratio is less than 2.0 simply supported or less than 2.5 continuous, and a lintel is simply a small beam that carries the wall above a door or window opening.

The four beam cases to memorise
  • Simply supported, central point load W: max bending moment WL/4 at the centre; max shear at the supports.
  • Simply supported, uniform load w: max bending moment wL2/8 at midspan; bending moment diagram is a parabola.
  • Cantilever, point load P at the free end: max bending moment PL at the fixed end; zero at the free end; deflection PL3/3EI.
  • Cantilever, uniform load w: max bending moment at the fixed end; free-end deflection wL4/8EI.
  • Point of contraflexure: bending moment zero and changing sign; shear force is the slope of the bending moment diagram.
IS 456 beam and slab limits
  • Minimum tension steel in a beam: 0.85bd/fy. Maximum tension steel: 4% of the cross-section.
  • Maximum compression steel in a beam: 0.04BD. Minimum steel in a slab: 0.12% for HYSD bars, 0.15% for mild steel.
  • One-way slab: longer span / shorter span greater than 2. Two-way slab: ratio 2 or less.
  • Main-bar spacing in a slab: not more than 3d or 300 mm. Effective span: centre-to-centre of supports, or clear span plus effective depth, whichever is less.

Columns: the members that must not buckle

A column is a vertical member that carries load downwards, mainly in compression, from the beams to the foundation. Two failures threaten it, and the slenderness ratio decides which one: a short column crushes, a long column buckles sideways before its material strength is reached. Euler gave the buckling load for a long column as pi2EI/Le2, where Le is the effective length, and the effective length depends on how the ends are held: equal to the real length when both ends are pinned, half the length when both ends are fixed, twice the length when one end is fixed and the other free, and about 0.7 times the length when one end is fixed and the other pinned. The slenderness ratio is the effective length divided by the least radius of gyration, and under IS 456 a reinforced concrete column is treated as long when its slenderness ratio exceeds 12. The code then fixes the steel: longitudinal steel not less than 0.8% and not more than 6% of the gross cross-sectional area, with 4% the practical maximum where bars are lapped; at least 4 bars of at least 12 mm diameter in a rectangular column and 6 in a circular one; and in a helically reinforced column at least 6 bars. Lateral ties hold those vertical bars in position, stop them buckling outwards under load, and resist shear. The commonest percentage of steel in a column in practice is about 1% to 4% of the section, and the paper's favourite trap is the rectangular column: its minimum is 4 bars, not 6, because 6 is the minimum for a circular column.

Column numbers (IS 456)
  • Longitudinal steel: minimum 0.8%, maximum 6% of gross area (4% practical at laps).
  • Minimum bars: 4 in a rectangular column, 6 in a circular column, 6 in a helically reinforced column; minimum bar diameter 12 mm.
  • Long column: slenderness ratio greater than 12. Euler buckling load: pi2EI/Le2.
  • Effective length: pinned-pinned L, fixed-fixed 0.5L, fixed-free 2L, fixed-pinned about 0.7L.

Concrete and reinforced concrete: the material that does the work

Concrete is strong in compression and weak in tension: its tensile strength is only about 10% of its compressive strength, which is the single fact that explains reinforced concrete. Steel bars are placed where the concrete would be pulled apart, because steel is strong in tension; that is why a singly reinforced beam carries its steel in the tension zone, why a doubly reinforced beam carries steel in both zones, and why prestressed concrete exists at all, to overcome the low tensile strength of concrete by squeezing it before it is loaded. The grade is the characteristic compressive strength in N/mm2 at 28 days: M15 is 15, M20 is 20 and M25 is 25, and ordinary concrete gains about 65% of its 28-day strength in 7 days and about 90% in 14 days. The nominal mixes to know are M15 at 1:2:4 and M20 at 1:1.5:3, with 1:1:2 the strongest of the mixes the papers list and 1:4:8 the weakest. Cement is the binding material, and its chemistry decides its behaviour: lime is 60 to 67% and silica 17 to 25%, with alumina 3 to 8% and iron oxide 0.5 to 6%; tricalcium silicate (C3S) gives early strength, dicalcium silicate (C2S) gives later strength, tricalcium aluminate (C3A) governs the initial setting, and low-heat cement keeps both C3S and C3A low. Ordinary Portland cement must not start setting in less than 30 minutes and must finish within 10 hours; sulphate-resisting cement is the choice where sulphate attack threatens, and blast-furnace slag cement is the choice for structures in sea water. The water-cement ratio, by weight of water to weight of cement, governs strength and workability together: more water makes placing easier and the hardened concrete weaker. Workability is measured by the slump test in the 30 cm cone, 75 mm of slump is medium workability, and about 5 to 10 cm of slump suits slabs and beams. Fresh concrete must be batched by accurate measurement, placed and compacted within about 30 minutes, and cured, kept moist, for at least 7 days, so that hydration can finish; compaction drives out air voids, segregation is the separation of coarse aggregate from the mortar, and bleeding is water rising to the surface. Coarse aggregate is anything larger than 4.75 mm. Cover protects the steel: IS 456 nominal cover is 20 mm for mild exposure, 30 mm for moderate, 45 mm for severe, 50 mm for very severe and 75 mm for extreme, and the minimum grade for reinforced work is M20.

Cement chemistry in one table
  • Lime (CaO) 60-67%; silica (SiO2) 17-25%; alumina (Al2O3) 3-8%; iron oxide (Fe2O3) 0.5-6%.
  • C3S (tricalcium silicate): early strength, high in rapid-hardening cement. C2S: later strength, high in low-heat cement.
  • C3A (tricalcium aluminate): governs initial setting and gives off the most heat; kept low in low-heat and sulphate-resisting cements.
  • Initial setting time not less than 30 minutes; final setting time not more than 10 hours. Soundness is tested with the Le Chatelier apparatus; setting time with the Vicat apparatus.
Concrete numbers to memorise
  • Grades: M15 = 15 N/mm2, M20 = 20 N/mm2, M25 = 25 N/mm2 at 28 days. Minimum grade for reinforced work: M20.
  • Nominal mixes: M15 1:2:4; M20 1:1.5:3. One 50 kg bag of cement is about 1.25 cubic feet.
  • Strength gain: about 65% at 7 days, about 90% at 14 days, full strength at 28 days. Cure for at least 7 days.
  • Slump cone 30 cm (12 in) high; slump measured in millimetres; 50-100 mm is medium workability. The slump mould itself is a frustum of a cone with a circular cross-section.
  • Modulus of elasticity of concrete: 5000 times the square root of fck (IS 456). Maximum concrete strain: 0.0035.

Steel: the tension member

Steel is the tension half of reinforced concrete and the whole of a steel structure. Its Young's modulus is about 200 GPa, its Poisson's ratio about 0.3, and its density about 7850 kg/m3; a number 4 American bar is half an inch in diameter. Fe 415 means a yield strength of 415 N/mm2, and HYSD bars, high-yield-strength deformed bars, are used because their high yield strength lets a member carry more load with less steel, while the deformations (the ribs) give the bond with the concrete that plain bars lack: a twisted or deformed bar develops about 50% more bond strength than a plain bar. Steel is made by remelting pig iron with coke and limestone, and the Bessemer process, blowing air through molten pig iron to burn out the impurities, was the early method that made steel cheap. Chromium is the ingredient that makes steel resist corrosion, which is why stainless steel does not rust; ordinary steel rusts by oxidation, and it is protected by painting or by galvanising, a coating of zinc that corrodes first and so protects the steel beneath. In a steel frame the I-section is the standard beam, because its flanges sit far from the neutral axis; a tie carries tension, a strut carries compression, and a gusset plate joins the members at a truss joint. A fillet weld joins two surfaces meeting at right angles, and its strength is governed by its throat, 0.7 times the size of the weld. Carbon fibre reinforcement is now used as a substitute for mild steel in precast products where corrosion must be avoided and weight matters.

Steel numbers
  • Young's modulus about 200 GPa; Poisson's ratio about 0.3; density about 7850 kg/m3.
  • Fe 415: yield strength 415 N/mm2. HYSD bars: high yield strength, deformed for bond.
  • Fillet weld throat = 0.7 x weld size. American bar #4 diameter = 0.500 inch.
  • Chromium gives corrosion resistance; galvanising is a zinc coating that protects steel sacrificially.

Foundations: putting the load into the ground

The foundation is the lowest part of a building and the part that carries its whole weight into the ground, so a foundation is designed against two separate failures: the soil failing in shear under the pressure, and the building settling too much or unevenly. The safe bearing capacity is the ultimate bearing capacity, the pressure at which the soil fails, divided by a factor of safety, commonly about 3. A foundation is shallow when its depth is less than or about equal to its width, and deep when its depth is much greater than its width. The shallow family is the isolated (spread) footing under a single column, the strip footing running continuously under a load-bearing wall, the combined footing carrying two or more columns when they are so close that their pads would overlap or when a column stands at a property line, the strap footing in which a cantilever beam joins two footings, and the raft (mat), one slab under the whole building, used when the soil is weak and the separate footings would cover about half the plan area. A trapezoidal combined footing is used when the columns carry different loads. The deep family is the pile: end-bearing piles stand their tips on a hard layer, friction piles carry load by skin friction along the shaft, and most piles use both. A pile cap joins a group of piles and spreads the column load over them. Water is the enemy of foundation work, so water is removed by dewatering and collected in a sump pit for pumping, and the stability of a structure against overturning depends most on the shape and size of its foundation. Differential settlement, one part sinking more than another, is what cracks walls and tilts buildings, which is why the bearing check and the settlement check are always done separately.

Choosing a foundation
  • Good soil near the surface, columns far apart: isolated footing under each column.
  • Load-bearing wall: strip footing. Columns close together or at a boundary: combined footing.
  • Two footings joined by a cantilever beam: strap footing. Weak soil, heavy or uneven loads: raft.
  • Weak upper soil over a firm layer: piles, end-bearing, friction, or both, joined by a pile cap.
  • Safe bearing capacity = ultimate bearing capacity / factor of safety (about 3). Size of a footing = column load / safe bearing pressure.

Dams, arches and bridges: structures that span and hold back

Dams, arches and bridges are the structures where shape does the work. A gravity dam is a massive concrete or masonry wall of roughly triangular section that resists the water by its own weight, so it needs a bedrock foundation; for it to be safe against overturning the resultant of all the forces must fall within the middle third of its base, which keeps the whole base in compression. An arch dam is the opposite idea: a thin curved concrete wall that sends the water load horizontally into the valley walls, so it belongs in a narrow gorge with strong rock abutments. A buttress dam is a lighter gravity dam, a sloping upstream deck carried on triangular buttresses, using far less concrete. An embankment dam is the most common type in the world, a broad mound of compacted earth or rock, usually with a clay core to stop seepage; its great danger is piping, water finding a path through and eroding it from inside. Every dam needs a spillway to release flood water safely downstream without overtopping, and the head available for hydropower is the difference in water level between the inlet and the outlet of the powerhouse. A cofferdam is the temporary watertight enclosure, pumped dry inside, that lets foundations and piers be built in a river bed. An arch works the same way in a bridge as in a dam: the arch ring carries its load mainly in compression and pushes outwards on its abutments. The parts of an arch to name are the intrados, the concave inner surface, the extrados, the convex outer surface, the soffit, the exposed underside, and the voussoirs, the wedge-shaped stones or bricks the arch is built from; centering is the temporary support that holds an arch or dome up until it can stand on its own.

The four dam types
  • Gravity dam: resists by weight; needs bedrock; resultant within the middle third of the base.
  • Arch dam: thin curved wall; load goes horizontally into the abutments; needs a narrow gorge and strong rock.
  • Buttress dam: sloping deck on triangular buttresses; much less concrete than a gravity dam.
  • Embankment dam: compacted earth or rock with a clay core; most common; danger is piping by seepage.
  • Spillway: releases flood water safely. Cofferdam: temporary dry enclosure for building in water.
Parts of an arch
  • Intrados: the concave inner surface. Extrados: the convex outer surface. Soffit: the exposed underside.
  • Voussoirs: the wedge-shaped bricks or stones of the arch ring. Keystone: the central voussoir at the crown.
  • Centering: the temporary framework that supports an arch or dome during construction.

Building materials and masonry: what the structure is built from

A structure is only as good as its materials, and the papers test them as facts to know rather than as theory. The standard brick in Pakistan is 9 by 4.5 by 3 inches; the frog is the shallow depression in its face that keys the mortar; the face that shows in the wall is the stretcher, the short 9 by 9 cm end is the header, and a brick laid on its long edge with its end exposed is a rowlock. Of the bonds, English bond, alternating headers and stretchers in every course, is the strongest and the one used for load-bearing walls. Stone splits easily parallel to its natural bed, so the bed must lie perpendicular to the load; granite is the polymineralic rock of the list, made of quartz, feldspar and mica. Timber: sapwood is the living wood in the outer region of a trunk, and teak, sheesham and babool are all hardwoods, babool being a dense acacia, so a question offering only those three has no softwood among its options. Lime comes as rich, poor and hydraulic, and adding water to quicklime is slaking, which gives slaked lime. Plaster is cured for at least 7 days, general plastering is about 25 mm thick, and a parge coat is a protective coat on a concrete surface. In paint, zinc oxide is the corrosion-resistant pigment, crazing is the fine cracking of a paint surface, and lacquer paints are resin and nitro-cellulose, less durable than enamel. A cavity wall slows damp with the air gap between its two leaves; coping is the protective cap on a wall top; an eave is the low edge of a sloping roof; a hipped roof slopes in four directions; a baluster is the small vertical member between a handrail and a stair; winders are the angular steps that turn a stair; and a dado, the protective band on the lower wall, is usually provided in bathrooms. Thermocole is the heat-insulating material of the papers, perlite is the expanded volcanic glass used as a lightweight aggregate, and acrylic is the transparent plastic used for glazing.

Brick and masonry facts
  • Standard brick in Pakistan: 9 x 4.5 x 3 inches. About 500 bricks to a cubic metre of brickwork.
  • English bond is the strongest bond. Frog: the depression in a brick face. Rowlock: brick on its long edge, end exposed.
  • Header: the short 9 x 9 cm end in the wall face. Stretcher: the long face in the wall face.
  • Stone bed must lie perpendicular to the load; stone splits easily parallel to its bed.
Timber, lime and finishes
  • Sapwood: living outer wood. Teak, sheesham and babool are all hardwoods; no softwood among them.
  • Lime: rich, poor and hydraulic. Slaking: adding water to quicklime. Cement plaster cured at least 7 days.
  • Cavity wall: two leaves with an air gap, against damp. Coping: cap on a wall top. Hipped roof: slopes in four directions.
  • Zinc oxide: corrosion-resistant paint pigment. Crazing: fine cracks in a paint surface.

How to revise this topic

Do one branch at a time, in the order above, and do not move on until you can answer its questions without looking. First memorise the number table: the IS 456 limits, the grades and mixes, the four beam cases and the four effective lengths, because those numbers are asked directly and they are the same in every paper. Then work the questions and read the explanation of every one you miss, especially the ones with 'None of these' as the answer, which are usually the papers testing whether you know the right value is not on the list. Watch for the traps this page is built around: 4 bars in a rectangular column against 6 in a circular one, 0.8% minimum against 4% practical maximum in a column, the moment of a force being torque rather than the first moment of area, silica at 20 to 25% in cement rather than 44 to 50%, and babool being a hardwood. Come back to the branch after a day and do it again; the second visit is what moves a rule from short memory into long memory. The same facts return year after year in BPSC, FPSC, PPSC and NTS papers, so a question you miss today is a question you will meet again.

More facts to learn

  1. Which law is also called the elasticity lawHooke's law
  2. Factor of safety may be defined as the ratio of ultimate stress toWorking stress
  3. If lateral earth pressure H is also is also included in design
  4. Then the ultimate strength U shall be given by _____ U = 1.4D + 1.7L + 1.7H
  5. In a truss, the members are assumed to be connected by which type of jointPin joints
  6. The stress produced by a suddenly applied load as compared to that produced by the same load when applied gradually isTwo-times
  7. The stress at which a material fails under repeated loading is called:Fatigue strength
  8. Which structural analysis method is widely used for complex and irregularly shaped structuresFinite element method
  9. The bending moment diagram of a simply supported beam carrying a uniformly distributed load is:A parabola
  10. In a truss, each member carries mainly:Axial force, either tension or compression
  11. A slab is called a one-way slab when the ratio of longer span to shorter span is:Greater than 2
  12. In a simply supported beam, the maximum bending moment under a central point load occurs at which pointAt midspan
  13. The deflection of a cantilever beam with a point load P at the free end is given byPL³/3EI
  14. A beam is attached with three fix supports, what will be the degree of indeterminacy of the beam6
  15. In a building, what is the main purpose of a slabTo form the floor or roof and carry loads to the beams
  16. In a simply supported beam carrying a uniformly distributed load, the maximum bending moment occurs at:Mid-span
  17. A continuous beam shall be deemed to be a deep beam if the ratio of its effective span to overall depth is:Less than 2.5
  18. The maximum bending moment in a cantilever beam with a point load at the free end occurs at theFixed end
  19. The maximum percentage of steel used in columns is4%
  20. In a building, which member mainly carries loads in compressionA column
  21. The slenderness ratio of a column is:Effective length divided by the least radius of gyration
  22. Parge is mainly a ______ coat applied on concrete surface
  23. Protective
  24. A synthetic rubber placed between two precast concrete elementsBearing Pad
  25. Tensile strength as compared to compressive strength of concrete is about percent.10%
  26. Which of the following is the main binding material in concreteCement
  27. Prestressed concrete is used mainly to:Overcome the low tensile strength of concrete
  28. Measuring the ingredients of concrete is termedBatching
  29. Concrete is strong in compression but weak in which propertyTension
  30. The apparatus used to find the setting time (initial and final) for cement isVicat apparatus
  31. Expanded volcanic glass, used as a lightweight aggregate in concrete and plaster and as an insulating fillPerlite
  32. A stiff straightedge of wood or metal used to level the surface of wet plaster or concreteDarby
  33. Why is steel used with concrete in reinforced concreteConcrete is weak in tension and steel is strong in tension
  34. The grade of concrete M15 means its characteristic compressive strength is:15 N/mm²
  35. Proper proportioning of concrete ensures:All of these
  36. The strength and quality of concrete depend upon:All of these
  37. For the quality control of Portland cement, the test essentially done is:All of these
  38. Water required per bag of cement is:35 kg
  39. For the continuous transportation of concrete over a long distance, the equipment used is:Concrete pumps
  40. About how many 50 kg bags of cement are needed for 1 cubic metre of 1:2:4 concrete6 bags
  41. The ratio of cement, sand and aggregate in M15 concrete is approximately1:2:4
  42. Segregation in fresh concrete means:The separation of coarse aggregate from the mortar
  43. A weld at the inside intersection of two metal surfaces that meet at right anglesFillet weld
  44. The primary product formed by remelting pig iron with coke and limestone isSteel
  45. Young's modulus of steel is approximately:200 GPa
  46. The strength of a fillet weld is governed mainly by its:Throat thickness
  47. Removal of water from the foundation is calledDewatering
  48. In a building, what is the main purpose of a footingTo spread the load of the column over a larger area of the soil
  49. A strip footing is provided under which of the followingA load-bearing wall
  50. Differential settlement of a foundation is dangerous because it:Causes cracks and tilting in the structure
  51. Wedge shaped brick used to construct the arch are calledVoussoirs
  52. An arch dam transfers most of the water load to:The valley walls (abutments)
  53. In an arch bridge, the arch ring carries the load mainly in:Compression. is used for heat and insulation in refrigerator and air conditioning buildings
  54. Thermocole
  55. The horizontal edge at the low side of a sloping roofEave
  56. Corrosive resistant pigment used in paints isZinc oxide
  57. Soft wood is produced byNone of these
  58. Thickness of general plastering work is kept at25 mm
  59. A ______ is essential in colder climates or when enclosing humid spaces in low slope roofs
  60. Vapor retarder
  61. Pick up the polymineralic rock from the following:Granite
  62. The process of making the background rough before plastering is called:Hacking
  63. Squeezing out of fresh water from cement mix is termed asBleeding